Rip Rap

Rip rap protecting a model railroad bridge, culvert, shoreline and embankment

Rip rap

Find Rip Rap Under 03

Rip rap is used where water and erosion meet railroad construction. ARM products ending in 03 are also called Sand & Gravel and can be used as rip rap.

How the 03 Rule Works

Look for the two-digit 03 ending. Those products live in Sand & Gravel even when the modeling job is rip rap.

Product number ends in 03

Use 03 material for culvert mouths, drainage channels, bridge approaches, shorelines, creek banks, and protected embankments.

Shop 03 Sand & Gravel →

Build a Natural Transition

Place the heaviest-looking material where water would scour the bank, then blend outward into smaller gravel, sand, dirt, and vegetation.